Environmental Planning

Water Resources

Manuals

Quality Assurance Manual

The Quality Assurance Manual (QAM) is required by ADOT's Permit. The purpose of the QAM is to document ADOT policies and procedures ensuring adequate quality assurance/quality control (QA/QC) for stormwater monitoring. The policies and procedures described are intended to ensure that stormwater analytical data meet the requirements of the Permit.

Erosion and Pollution Control Manual / BMP Detail Drawings

This manual will assist in the development of erosion and pollution control measures during both design and construction of roadways. It outlines ADOT's procedures for complying with water quality regulations and permits, provides a variety of available Best Management Practices (BMPs), and guidance in the selection of those BMPs on ADOT construction project. The sediment control and water quality protection BMP detail drawings are also available for download on its separate Web page. They are periodically updated. Please refer to the list of these drawings frequently for future updates.

Post-Construction Best Management Practices (BMP) Manual

This updated manual guides all staff involved in implementing new development and redevelopment projects that disturb one or more acres of land in the ADOT MS4 (municipal separate storm sewer system). The manual includes planning considerations, design standards, and maintenance needs associated with stormwater treatment features that will continue to remove pollutants in runoff after construction is completed.

Maintenance and Facilities Best Management Practices (BMP) Manual

This manual will assist the user in establishing the proper erosion and pollution control measures to be used during the maintenance of roadways and operations of facilities. It outlines ADOT’s procedures for complying with water quality regulations, and guides in the selection of BMPs for ADOT maintenance activities and agency facilities operations.

Stormwater Enforcement Response Plan

This Stormwater Enforcement Response Plan (ERP) codifies enforcement procedures used by ADOT to enforce provisions of its Arizona Pollutant Discharge Elimination System (AZPDES) Statewide Stormwater Permit No. AZS000018-2008. This ERP describes the measures available to ADOT to exercise its authority. The ERP identifies enforcement procedures designed to encourage a timely response by the discharger

Clean Water Act Section 404/401 Guidance Manual

This manual provides an overview of Sections 404 and 401 of the Clean Water Act, as they apply to Arizona Department of Transportation activities. Compliance with Sections 404 and 401 is necessary for Arizona Department of Transportation activities that involve the discharge of dredged or fill material into waters of the United States. The manual also provides general guidance on the preparation of jurisdictional delineations, Nationwide Permit Pre-Construction Notification submittals, and Individual Permit applications.

Civil RightsTitle VI of the Civil Rights Act of 1964, and the Americans with Disabilities Act (ADA)

Pursuant to Title VI of the Civil Rights Act of 1964, and the Americans with Disabilities Act (ADA), ADOT does not discriminate on the basis of race, color, national origin, age, sex or disability. Persons that require a reasonable accommodation based on language or disability should contact ADOT’s Civil Rights Office at 602.712.8946 or at civilrightsoffice@azdot.gov. Requests should be made as early as possible to ensure the State has an opportunity to address the accommodation.

De acuerdo con el título VI de la Ley de Derechos Civiles de 1964 y la Ley de Estadounidenses con Discapacidades (ADA por sus siglas en inglés), el Departamento de Transporte de Arizona (ADOT por sus siglas en inglés) no discrimina por raza, color, nacionalidad, edad, género o discapacidad.  Personas que requieren asistencia (dentro de lo razonable) ya sea por el idioma o por discapacidad deben ponerse en contacto con la Oficina de Derechos Civiles al 602.712.8946 o en civilrightsoffice@azdot.gov. Las solicitudes deben hacerse lo más pronto posible para asegurar que el equipo encargado del proyecto tenga la oportunidad de hacer los arreglos necesarios.